I got the bus over to Dave Ellis on Monday and he got the electrical NAILED! He soldered the ground in the back and ran a new wire. He also adjusted the valves, which #2 AND #4 were sticking, adj the clutch, and brakes. He also gave me a laundry list of things that need to be resolved: Rear wheel cylinder is leaking, Need new axle boots and fill the RGB, Trans fluid, tightened the fan belt before vacation. I need the king pins on the passenger side and oil pressure switch. RGB and Sterring box maintenance Here is a pict out side his garage with a Ghia that matches the bus . . . . Too bad the camera on my phone blows 😦
-
Pages
-
Archives
- January 2016
- March 2015
- March 2014
- August 2011
- July 2011
- July 2010
- May 2010
- March 2010
- February 2010
- September 2009
- August 2009
- July 2009
- June 2009
- May 2009
- April 2009
- February 2009
- January 2009
- December 2008
- November 2008
- September 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
-
Categories
- Checklist (2)
- Fun Stuff (11)
- Maintenance (15)
- the begining (22)
- Things To Do (5)
- Uncategorized (30)